User Tools

Site Tools


support:storage:pricing_template

This is an old revision of the document!


Basic storage rate parameters

Shown below is the screen used to configure basic storage rate parameters

ParametersRequiredDescription
First a days @ $ b per day/hrNoThe first a days of storage will be charged at this rate per specified unit of time.
Next c days @ $ d per day/hrNoAfter the first a days of storage have elapsed (if specified), the next c days of storage will be charged at this rate per specified unit of time, up to (a + c) days.
Thereafter, $ e per day/hrYesAfter the first (a + c) days of storage have elapsed (if specified), the remaining days will be charged at $e per day/hr.
Grace periodYesThe number of minutes after the storage job is admitted before storage costs start accruing.
Grace period is included in/excluded from billingYesIf the grace period expires before someone shows up to claim the vehicle, this setting dictates whether or not the grace period is included in billing.

For example, if the grace
support/storage/pricing_template.1327600414.txt.gz · Last modified: 2012/01/26 12:53 by edmondsj