This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision | |||
|
support:07_storage-impound:lot_management_frequently_asked_questions [2015/12/28 15:37] seyers |
support:07_storage-impound:lot_management_frequently_asked_questions [2015/12/28 15:40] (current) seyers |
||
|---|---|---|---|
| Line 39: | Line 39: | ||
| Both the above methods will place vehicles into "Pending" in Lot Management. See "Pending" on the right side pop out panel. Once vehicles are in "Pending", you will need to complete the admit process as follows: | Both the above methods will place vehicles into "Pending" in Lot Management. See "Pending" on the right side pop out panel. Once vehicles are in "Pending", you will need to complete the admit process as follows: | ||
| - Click on a vehicle to open job details. | - Click on a vehicle to open job details. | ||
| - | - Note the 4 yellow areas that are required to save a job (Code, Account, pricing template, Bill to). | + | - Complete the 4 yellow areas that are required to save a job (Code, Account, pricing template, Bill to). |
| - | * If vehicle was towed to lot, you will see in Remarks section "Created from tow job xxxxxxx" which means there is a tow job linked to the storage job | + | |
| + | If vehicle was towed to lot, you will see in Remarks section "Created from tow job xxxxxxx" which means there is a tow job linked to the storage job | ||
| - Enter any other details that you wish | - Enter any other details that you wish | ||
| - | - Choose the correct Impound Lot if you have multiple or entered manually | + | - Choose the correct Impound Lot if you have multiple or entered job manually |
| - SCROLL down to the bottom of the page and click the orange Save button. | - SCROLL down to the bottom of the page and click the orange Save button. | ||
| - Confirm the Admit Time through the next dialog box and click OK. | - Confirm the Admit Time through the next dialog box and click OK. | ||